Burner shipped for ISA Smelter in Indonesia

Share This Post

Share on facebook
Share on linkedin
Share on twitter
Share on email

In fall 2019 we received an order from Australia on a burner with longer flame than normal. In late November we did extensive tests on the new burner in our workshop before it was shipped to Australia in December. The burner will be used within an ISA Smelter in Indonesia. 

The burner delivered has an extensive fan directory to optimize combustion even when the burner is used at a low capacity. We tested the burner from 1 to 100 percent capacity and the result is highly effective combustion through the whole range as well as a long and steady flame. 

This burner is the second we deliver to an ISA Smelter. We have previously delivered burners for an ISA Smelter in Zambia. 

Video from the test of the burner

Arctic Vent Control

New beacons for vehicle detection in LKAB

Gefa System AB together with Euroroc, a subcontractor to LKAB, have installed new beacons in all the vehicles used by Euroroc on Fabian 955.

Arctic Heat

Gefa Systems high pressure burners are attracting a lot of attention

In August this year, Gefa System received an order for a complete burner system from Palabora Mining Company in South Africa. The burner system will be used in a PS Converter in a copper smelter, something that has become a specialty for Gefa’s burners.

Not sure how to approach your next project? We can help.

Read more about how we can help you
make your next project a success.